HB Reality (Osiyan Warehousing)
Back to All Projects
Industrial Warehousing & Heavy Road Corridor

HB Reality (Osiyan Warehousing)

Khatwad Phata, Talegaon, Dindori, Nashik

Ten Gates
Project Overview
Client EntityHB Reality
Site LocationKhatwad Phata, Talegaon, Dindori, Nashik
Execution Model100% In-House Direct EPC
Engineering Case Study // Industrial Warehousing & Heavy Road Corridor

Institutional scale executed to uncompromising structural tolerances.

A flagship multi-acre industrial logistics park located at Khatwad Phata, Talegaon-Dindori near Nashik. The project involves 10,950 sqm of covered industrial warehousing and 9,000 sqm of heavy freight arterial concrete roads engineered for 50-ton multi-axle freight movement. Started on 01 February 2026.

10,950 sqm
Warehouse Footprint
9,000 sqm
Road Works
01 Feb 2026
Mobilization Date
50 Tons
Axle Load Rating

Technical Scope & Execution Specifications

10,950 sqm High-Bay Warehousing

Engineered for high-throughput logistics with 12m clear heights, trimix floor slabs, and integrated loading docks.

100 mtr Retaining Wall (4.5m Height) & Stormwater Drainage

Heavy reinforced concrete retaining wall stretching 100 meters at 4.5m height, with integrated internal stormwater drainage line.

9,000 sqm Heavy Freight Concrete Roads

M35 grade trimix pavement with double-layer reinforcement to withstand 50-ton continuous container traffic.

Deep Excavation & Foundation Setting

Heavy earthmoving and hydraulic breaker operations on basalt strata to establish foundation baselines.

Visual Documentation

Project Progress Gallery

01 / 04
Wide-span high-bay structural steel column and rafter erection.
Phase 03 // Superstructure Erection

Wide-span high-bay structural steel column and rafter erection.